• Biowatt 1000 Biomass Gasification Power Generation Equipment with a Thermal Electric Parallel Energy Efficiency of 74%
  • Biowatt 1000 Biomass Gasification Power Generation Equipment with a Thermal Electric Parallel Energy Efficiency of 74%
  • Biowatt 1000 Biomass Gasification Power Generation Equipment with a Thermal Electric Parallel Energy Efficiency of 74%
  • Biowatt 1000 Biomass Gasification Power Generation Equipment with a Thermal Electric Parallel Energy Efficiency of 74%
  • Biowatt 1000 Biomass Gasification Power Generation Equipment with a Thermal Electric Parallel Energy Efficiency of 74%

Biowatt 1000 Biomass Gasification Power Generation Equipment with a Thermal Electric Parallel Energy Efficiency of 74%

Usage: Gas
Purpose: Gas Manufacturing
Parts: Valve
Application Fields: Generator Set
Noise Level: Ordinary
Machine Size: Large
Customization:
Manufacturer/Factory & Trading Company
Gold Member Since 2023

Suppliers with verified business licenses

Jiangsu, China
to see all verified strength labels (17)

Basic Info.

Model NO.
Biowatt1000
Condition
New
Certification
CE
Rated Power(Kw)
1000kw
Rated Voltage(V)
220/400/440/6300/6600/11000/ 13800V
Rated Frequency(Hz)
50/60Hz
Biomass Consumption(Kg/Hr)
1000-150
Gas Production(Nm³/H)
2500-3000
Ash Discharge Type
Dry Ash Discharge/Wet Ash Discharge
Length
30000mm
Height
11000-14000mm
Width
5813-7300mm
Transport Package
ISO Containers
Specification
1000kw
Trademark
powermax
Origin
Jiangsu, China
Production Capacity
100set/Sets Per Year

Product Description

The BIOWATT500&1000 biomass gasification system is built into multiple skid-mounted container-type frames, easy to ship and fast to install.

The BIOWATT500&1000 complete system is built into multiple skid-mounted container-type frames that make transportation installation simple. This means that equipment is fully tested in the factory before arriving at site, minimizing commissioning time.

Easy to operate and transport, the system can be unloaded from the truck and installed rapidly for quick operation.

No need of factory building, on-site installation only takes within 7-10 working days.Biowatt 1000 Biomass Gasification Power Generation Equipment with a Thermal Electric Parallel Energy Efficiency of 74%Biowatt 1000 Biomass Gasification Power Generation Equipment with a Thermal Electric Parallel Energy Efficiency of 74%Biowatt 1000 Biomass Gasification Power Generation Equipment with a Thermal Electric Parallel Energy Efficiency of 74%Biowatt 1000 Biomass Gasification Power Generation Equipment with a Thermal Electric Parallel Energy Efficiency of 74%Biowatt 1000 Biomass Gasification Power Generation Equipment with a Thermal Electric Parallel Energy Efficiency of 74%Biowatt 1000 Biomass Gasification Power Generation Equipment with a Thermal Electric Parallel Energy Efficiency of 74%Complete solution for biomass power generation and heat supply.

Easy installation with factory pre-assembly. Start / stop at any time.

Compact and space-saving design.

No need for factory building, suitable for many countries.

System components such as transport system, de-ashing system, or fuel dryer available in combination with all Powermax equipment.Biowatt 1000 Biomass Gasification Power Generation Equipment with a Thermal Electric Parallel Energy Efficiency of 74%Biowatt 1000 Biomass Gasification Power Generation Equipment with a Thermal Electric Parallel Energy Efficiency of 74%Biowatt 1000 Biomass Gasification Power Generation Equipment with a Thermal Electric Parallel Energy Efficiency of 74%Biowatt 1000 Biomass Gasification Power Generation Equipment with a Thermal Electric Parallel Energy Efficiency of 74%Biowatt 1000 Biomass Gasification Power Generation Equipment with a Thermal Electric Parallel Energy Efficiency of 74%

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now